19-05-2023, 09:54 AM
Yesterday, the power supply unit was reinstalled in the HMV 902. Those EHT components really do look rather exposed! At least the U16 rectifier valve has an insulated top cap.
A box must be made to contain the EHT transformer and valve. The HT rectifier valve and smoothing choke will have to be repositioned to make space for the box.
Geordie McBoyne.
A box must be made to contain the EHT transformer and valve. The HT rectifier valve and smoothing choke will have to be repositioned to make space for the box.
Geordie McBoyne.







