01-12-2015, 08:59 PM
(This post was last modified: 01-12-2015, 08:59 PM by AlanBeckett.)
(01-12-2015, 08:30 PM)pwdrive Wrote: I looked at the main incomer to the henly type block, L&N in L&N out to the meter, no earth provision at that block so it lookks TT, didn't have time to investigate further but he did say that the earth cable to the rod was secured to the rod with a jubilee clip about 20 years ago and had not been touched since, it's all very damp at the sawmill, might look into it further on another visit.
Take some Wellies and thick Rubber Gloves.
Alan






