26-06-2014, 09:29 AM
Sparks was supposed to come yesterday but didn't make it. My wife wooed him with the promise of coffee and homemade cake and he turned up this morning.
Reconfigured the panel so that there are two RCD areas, much as before, but the utility room sockets, which are where the frozen cabinets are plugged into, now go to a separate 30A RCBO. Then there is another 6A RCBO for outside lights etc.
So to me a pretty good setup and I'm happy with it.
Re-labelled by white stick on paper but I will get around to doing something better. Maybe a CorelDraw exercise when I get time.
You obviously understand things well Alan ... thanks to both you and Lawrence.
Gary
Reconfigured the panel so that there are two RCD areas, much as before, but the utility room sockets, which are where the frozen cabinets are plugged into, now go to a separate 30A RCBO. Then there is another 6A RCBO for outside lights etc.
So to me a pretty good setup and I'm happy with it.
Re-labelled by white stick on paper but I will get around to doing something better. Maybe a CorelDraw exercise when I get time.
You obviously understand things well Alan ... thanks to both you and Lawrence.
Gary