25-06-2014, 01:21 PM
(This post was last modified: 25-06-2014, 01:25 PM by Radio Fixer.)
I know you shouldn't trip the RCD Alan but I don't know what caused it. Could have been the electric mower, I had cut the lawn earlier, but that is double insulated and all plastic with no earth wire.
What does PMEd mean? If it means signed off by the 'sparks' then Yes! we are.
Main thing is to get the frozen stuff on there own RCD.
Glad my setup is not too out of order.
Wonder if its a good idea to have the boiler on that new RCD as well? Could be handy if away in cold weather.
thanks Gary
What does PMEd mean? If it means signed off by the 'sparks' then Yes! we are.
Main thing is to get the frozen stuff on there own RCD.
Glad my setup is not too out of order.
Wonder if its a good idea to have the boiler on that new RCD as well? Could be handy if away in cold weather.
thanks Gary







