17-06-2013, 07:24 PM
Next, the brass framework and the associated parts were identified and cleaned. The parts were assembled using the correct screws where missing. The square battery holder was bolted to the rear of the framework.
The movement was cleaned and checked for correct operation. The electrical contacts were cleaned and adjusted roughly at this point.
The movement was then bolted to the framework.
The pictures show the framework parts, the framework assembled, the movement itself and the movement fitted to the framework.
The movement was cleaned and checked for correct operation. The electrical contacts were cleaned and adjusted roughly at this point.
The movement was then bolted to the framework.
The pictures show the framework parts, the framework assembled, the movement itself and the movement fitted to the framework.






