Been reviewing just the Design & Access statement and quite a few errors!
There is a point made:
"In terms of gas yield the AD plant would be expected to generate around 70GWh of biomethane
to be produced from the plant and injected into the grid per year.
In addition the plant will generate around 8GHh of power which will feed the adjacent plant
based extraction facility and fed into the grid."
So, it is mostly commercial energy production, not agricultural in my opinion.
The pedestrian and cycle access is straight on to the very busy A16 bypass, with no footpaths!
Reference to "Proposals for the plant based protein extraction facility
emerged during 2020 with the first concepts developed the
first quarter of 2021. Following approval and construction of
the extraction factory discussions have turned in the last few
months to the Anaerobic Digesters Plants and Rangell Gate
and also the Surfleet site."
is the nearly complete factory site at the North end of the propose site making protein type products from cabbage waste on Rangell gate, adjacent the roundabout...
https://planning.sholland.gov.uk/OcellaW...16-0959-21&from=planningSearch
refers to this
I am making notes as i go along and am awaiting two phone calls from our 2 ward councilors.
I also note there is no deadline given for comments or objections, just a decision date.
I will also be making an appointment with our planning dept. for clarification of certain aspects and more background information that can be used for any comments or objections.
I feel there is a lot the public need to know that is not mentioned in the application.
There is an adopted local plan that shows the site as being within this local plan area, with point 4 showing the site being within the pale green countryside area.
http://www.southeastlincslocalplan.org/adopted-plan/
This morning I met another neighbour who has lived here as long as us , 44 years and she is horrified at the thought!
I appreciate you will have lots of other things to occupy your time and I provide the above information to keep you informed of what I an up to at the moment.
However, any comments are always appreciated.
Thanks,
Rob
There is a point made:
"In terms of gas yield the AD plant would be expected to generate around 70GWh of biomethane
to be produced from the plant and injected into the grid per year.
In addition the plant will generate around 8GHh of power which will feed the adjacent plant
based extraction facility and fed into the grid."
So, it is mostly commercial energy production, not agricultural in my opinion.
The pedestrian and cycle access is straight on to the very busy A16 bypass, with no footpaths!
Reference to "Proposals for the plant based protein extraction facility
emerged during 2020 with the first concepts developed the
first quarter of 2021. Following approval and construction of
the extraction factory discussions have turned in the last few
months to the Anaerobic Digesters Plants and Rangell Gate
and also the Surfleet site."
is the nearly complete factory site at the North end of the propose site making protein type products from cabbage waste on Rangell gate, adjacent the roundabout...
https://planning.sholland.gov.uk/OcellaW...16-0959-21&from=planningSearch
refers to this
I am making notes as i go along and am awaiting two phone calls from our 2 ward councilors.
I also note there is no deadline given for comments or objections, just a decision date.
I will also be making an appointment with our planning dept. for clarification of certain aspects and more background information that can be used for any comments or objections.
I feel there is a lot the public need to know that is not mentioned in the application.
There is an adopted local plan that shows the site as being within this local plan area, with point 4 showing the site being within the pale green countryside area.
http://www.southeastlincslocalplan.org/adopted-plan/
This morning I met another neighbour who has lived here as long as us , 44 years and she is horrified at the thought!
I appreciate you will have lots of other things to occupy your time and I provide the above information to keep you informed of what I an up to at the moment.
However, any comments are always appreciated.
Thanks,
Rob