01-05-2016, 08:43 AM
Or how the tin fits in.
This is the only known footage as far as I know of a raise round being drilled and blasted in Cornwall, the footage appears to be made for camera as it were so as to show the procedure of a now defunct art down here, 1st one is drilling, 2nd one is charging the bang, the footage was shot down Holman Bros test mine and is used by CSM (Camborne School of Mines):
https://www.youtube.com/watch?v=405qtjail54
https://www.youtube.com/watch?v=-3NLi3-QXZE
The raise is essential for the extraction of the tin bearing ore, the ore is Cassiterite (SnO2)
The raise would have been driven at a steep angle in the ore vein to the half way point between the level it was started at and the next level up, typically down here that would be a height of anywhere between 120ft and 180ft, at the half way point the raise comes back on itself as it were which creates a dog leg, when the stope is started it starts at the dog leg where a bench is drilled and blasted out, this was called the point bench, subsequent benches would then be drilled and blasted progressing up the raise, which created a series of large "steps"
The miners, normally two of them, stand on a plank that's supported on two L pegs that are slid into two holes drilled into the foot wall side of the raise, for the first couple of rounds or so access to the platform is by iron ladder, from then on it's by chain only, a short ladder hangs off one of the platform support pegs, this gives the claw on the drills jack leg something to push against to advance the drill.
Looking at the films it appears the miner (Mark) has only drilled a short and small round for demonstration purposes, it starts off with the "cut" one of the "cut" holes has been reamed out, this was standard practice in a raise, the bang and det's he's using are the more modern stuff using igniter fuse millisecond det's, when I worked down there it was all electric det's with stronger sticks of bang, those dets had a longer delay time which enabled the reports to be counted when fired, this was important from a safety point of view as miss fires could be accounted for, the electric det's were connected in series, we rarely used stemming when charging up,we just made sure the last stick of bang was rammed home really hard.
Spacer sticks (wooden) would be used in the "cut" holes back in the day using the stronger sticks of bang, that was to prevent the "cut" freezing up, this can happen when the blast is so intense that the small fragments of rock and dust created during the first milliseconds of the blast reform back to near solid rock due to the intense heat and pressure.
When I worked down there (Not the test mine, South Crofty mine) Mark would have still been at school, I had the honour of working with his Dad once for a short while, his Dad was a legend in mining circles down here.
All that for some solder and bean tins.....
Lawrence.
This is the only known footage as far as I know of a raise round being drilled and blasted in Cornwall, the footage appears to be made for camera as it were so as to show the procedure of a now defunct art down here, 1st one is drilling, 2nd one is charging the bang, the footage was shot down Holman Bros test mine and is used by CSM (Camborne School of Mines):
https://www.youtube.com/watch?v=405qtjail54
https://www.youtube.com/watch?v=-3NLi3-QXZE
The raise is essential for the extraction of the tin bearing ore, the ore is Cassiterite (SnO2)
The raise would have been driven at a steep angle in the ore vein to the half way point between the level it was started at and the next level up, typically down here that would be a height of anywhere between 120ft and 180ft, at the half way point the raise comes back on itself as it were which creates a dog leg, when the stope is started it starts at the dog leg where a bench is drilled and blasted out, this was called the point bench, subsequent benches would then be drilled and blasted progressing up the raise, which created a series of large "steps"
The miners, normally two of them, stand on a plank that's supported on two L pegs that are slid into two holes drilled into the foot wall side of the raise, for the first couple of rounds or so access to the platform is by iron ladder, from then on it's by chain only, a short ladder hangs off one of the platform support pegs, this gives the claw on the drills jack leg something to push against to advance the drill.
Looking at the films it appears the miner (Mark) has only drilled a short and small round for demonstration purposes, it starts off with the "cut" one of the "cut" holes has been reamed out, this was standard practice in a raise, the bang and det's he's using are the more modern stuff using igniter fuse millisecond det's, when I worked down there it was all electric det's with stronger sticks of bang, those dets had a longer delay time which enabled the reports to be counted when fired, this was important from a safety point of view as miss fires could be accounted for, the electric det's were connected in series, we rarely used stemming when charging up,we just made sure the last stick of bang was rammed home really hard.
Spacer sticks (wooden) would be used in the "cut" holes back in the day using the stronger sticks of bang, that was to prevent the "cut" freezing up, this can happen when the blast is so intense that the small fragments of rock and dust created during the first milliseconds of the blast reform back to near solid rock due to the intense heat and pressure.
When I worked down there (Not the test mine, South Crofty mine) Mark would have still been at school, I had the honour of working with his Dad once for a short while, his Dad was a legend in mining circles down here.
All that for some solder and bean tins.....
Lawrence.


.