30-06-2024, 08:32 PM
Finding it a challenge to fit all the stuff on the front panel.
I was going to have the two HT supplies separately switchable to full volts or half, but running out of space.
Also the breakdown/leakage test feature might exceed the voltage ratings of a switch?
I was going to have the two HT supplies separately switchable to full volts or half, but running out of space.
Also the breakdown/leakage test feature might exceed the voltage ratings of a switch?